Road Building

Project: Reconstructionof Sherman Access

Client: City of Hamilton
Engineer: Phillips Engineering
Contract Value: $1.7 million
Project Location: Hamilton Mountain
Construction Period: June 2005 - Oct 2005
Project Description:

Reconstruct and widening the Sherman Access, which included the replacement of the steel retaining wall with a precast concrete block retaining wall, and the
reconstruction and widening the road.

 

Project: City of Welland overlay for 2005

Client: City of Welland
Contract Value: $800,000.00
Project Location: Various streets in the City of Welland
Construction Period: July 2005 - Nov. 2005
Project Description:

Resurfacing program requires a range of activities such as concrete curb repairs, base asphalt repairs to final overlay of surface asphalt. The City will have a number of streets throughout their system all requiring different degrees of attention.

 

Project: MTO Hwy# 58 & 58 A

Client: Ministry of Transportation
Engineer: D. M. Wills & Asso. LTD.
Contract Value: $6.0 million

Project Location:
Hwy#58 from Hwy# 3 Port Colborne North to Humber Rd. Welland, ON
Hwy #58A From Hwy58 to east of Hwy #140

Construction Period: Aug 2005 - July 2006
Project Description:

Rehabilitation of Hwys 58 & 58A .Tow Phase contract 1st phase 2005 and 2nd phase 2006 .
Including grading and drainage improvements, hot mix paving, illumination and traffic signal upgrades.